Landscaping and decking across Melbourne0478 900 724 · evergreen@evergreen-ec.com

Melbourne decking and landscaping

Decking installation and landscaping in Melbourne.

Merbau and composite decking planned around finished levels, framing, drainage, steps and the surrounding outdoor area across northern, north-western and western Melbourne.

Timber deck beside a landscaped retaining wall in Melbourne

A deck starts with levels, access and a suitable frame.

The visible boards are only one part of a decking project. The quotation also considers the finished height, ground clearance, frame, support points, steps, edges, drainage, ventilation and access to the work area.

Evergreen Exteriors Care installs timber and composite decking for suitable residential projects. Decking can also be coordinated with landscaping, concrete or retaining work when those items are included in the agreed quotation.

Before choosing boards, read the decking and landscaping planning guide for door thresholds, existing concrete, drainage, airflow and Victorian permit questions.

Send measurements and photos

Installation planning

What should be decided before decking installation starts?

A useful quotation starts with how the deck will connect to the home and the rest of the yard—not only the choice between timber and composite boards.

Finished height and transitions

Record the height at doors, paths, concrete and garden edges. These measurements help determine the frame, steps, fascia and safe transitions required for the actual site.

Drainage, airflow and inspection access

Water needs a suitable route away from the structure, and the subfloor needs appropriate clearance and ventilation. Existing concrete, low ground clearance or restricted perimeter airflow can change the construction approach.

One coordinated outdoor scope

Identify retaining edges, concrete, gates, turf, artificial grass and garden areas before work starts. The quotation can then state which items are included and the practical construction order.

Who checks whether a building permit is required for a deck in Victoria?

Victorian guidance says decks typically use a structural subfloor and require a building permit, while the exact classification and approval path depend on the proposed structure and site. The property owner should check the design with the relevant local council or building surveyor before work starts and provide any required approvals. See the Building and Plumbing Commission landscaping guidance.

Current guide rates

Decking cost per square metre in Melbourne

The most suitable material and construction approach depend on the intended use, maintenance preference and actual site conditions.

Merbau timber decking

$270/m² + GST ($297/m² including GST). Includes supply and installation of Merbau decking boards, standard framing and fixings. Subject to final site measurements and conditions.

Merbau timber provides a natural finish. The selected boards, fixings and ongoing care should suit the exposed location and desired appearance.

Composite decking

$260/m² + GST ($286/m² including GST). Includes supply and installation of composite decking boards, standard framing and fixings. Subject to final site measurements and conditions.

Composite boards provide a consistent contemporary finish with different maintenance characteristics. Board selection and installation details are confirmed for the project.

Decking with concreted posts

$320/m² + GST ($352/m² including GST). This option uses framed posts concreted into the ground. Decking material, height, footings, levels, steps and access requirements are confirmed in the quotation.

Merbau or composite decking?

Merbau: natural timber appearance

Merbau offers a natural timber look. It needs routine cleaning and may need recoating over time to maintain the preferred appearance, particularly in exposed outdoor areas.

Composite: consistent manufactured finish

Composite boards offer a consistent contemporary finish and different maintenance characteristics from timber. They are not maintenance-free: routine cleaning and the board manufacturer's care instructions still apply.

The frame matters for both

Whichever board is selected, the finished result depends on a suitable frame, support points, ground clearance, ventilation, drainage and correct transitions to doors, paths and garden areas.

What does standard supply and installation include?

The displayed guide rates include supply and installation of the selected decking boards, standard framing and fixings. A written quotation confirms the board selection, measured area and the construction required for the actual site.

Site-specific work such as stairs, fascia, demolition and removal, excavation, difficult access, elevated supports or posts, drainage work and waste disposal is confirmed separately when required. This keeps the quotation clear instead of assuming every backyard needs the same construction.

What affects a decking quotation?

Deck size is important, but it is not the only factor. Pricing and scope can change with board type, frame construction, ground clearance, excavation, access, stairs, fascia, removal of an existing deck, waste disposal and connections to surrounding landscaping.

For a useful first assessment, send the approximate length and width, the suburb, wide photos from several angles, access photos and the approximate height from the ground to the intended finished surface.

Service areas

Suitable decking projects are considered across Preston, Reservoir, Epping, Craigieburn, Doreen, Sunbury, Melton, Werribee and surrounding northern, north-western and western Melbourne suburbs. See our service areas or send your suburb to confirm availability.

Frequently asked questions

How much does decking cost per square metre?

Composite decking is $260/m² + GST ($286/m² including GST), Merbau is $270/m² + GST ($297/m² including GST), and decking with posts concreted into the ground is $320/m² + GST ($352/m² including GST). A 10m² minimum charge applies. Standard delivery is $100 + GST per estimate; site-specific extras are quoted separately.

Compare 20m² decking examples including delivery and GST, or calculate your own area.

What should I send for a decking quote?

Send your suburb, approximate deck length and width, photos of the area and access, the intended deck height and whether you prefer timber or composite boards.

Do you install both timber and composite decking?

Yes. Both options are available for suitable residential projects. The material, frame, levels and complete scope are confirmed in the quotation.

What does standard decking supply and installation include?

The displayed guide rates include the selected decking boards, standard framing and fixings. Site-specific work such as stairs, fascia, demolition, excavation, difficult access, elevated supports, drainage work and waste disposal is confirmed separately when required.

Is composite decking maintenance-free?

No. Composite decking has different maintenance characteristics from timber, but it still needs routine cleaning and care in line with the board manufacturer's instructions.

How do I choose between Merbau and composite decking?

Choose Merbau for a natural timber appearance and composite for a consistent manufactured finish. Consider appearance, cleaning and care, exposure, board selection and the site-specific frame before deciding.

Can decking be completed with landscaping or retaining work?

Yes. Decking can be coordinated with landscaping, retaining edges, grass or concrete work when those services form part of the agreed project scope.

For more planning advice, read our decking and backyard layout guide or explore retaining-wall and decking services.

Planning a new deck?

Send the size, height, access details and clear site photos.

Get a free quote